1
/
of
7
ZITTZ-NoMoreFearofLosing
Cat Tracker,No Monthly Fee GPS Trackers for Cats,Pet Tracker Work with Apple Find My App(iOS Only),Real-Time Location Tracking,Cat Tracker GPS Collar with Safety Elastic Buckle-LightGreen
Cat Tracker,No Monthly Fee GPS Trackers for Cats,Pet Tracker Work with Apple Find My App(iOS Only),Real-Time Location Tracking,Cat Tracker GPS Collar with Safety Elastic Buckle-LightGreen
Regular price
$43.17
Regular price
Sale price
$43.17
Quantity
Couldn't load pickup availability
About This
- 🐱【No Monthly Fees, Easy to Setup】 Cat tracker without subscription and monthly fees. Simply remove the covering paper from the battery and active it (beep sound), then turn on bluetooth and Apple find my app, taps on "Add Item" and "Other Supported Item", wait for successful pairing to complete the setup. It only compatible with ios device (iPhone, iPad, etc.), not for Android.
- 🐱【Global Tracking with Bluetooth Technology】Cat tracker tag utilizes Bluetooth Low Energy (BLE) to communicate with nearby Apple devices for seamless connectivity and to help pinpoint location. Therefore, if the cat tracker's tag is out of Bluetooth range, other nearby Apple devices can anonymously relay the location to the owner, thus ensuring wider tracking coverage.
- 🐱【Built-in Speaker, Long Battery Life】Easily locate this cat tracker by playing sound with 250ft bluetooth range. The pet tracker for cats weighs only 0.77 oz, equipped with a sturdy silicone tag holder, sturdy and anti-fall. Cat tracker collar is powered by long-lasting battery CR2032 with 1-year standby time ensures that your pet tracker is always ready for use and can be easily replaced for long-term use.
- 🐱【Adjustable Straps with Comfortable Material】Cat tracker collar is adjustable to fit pet necks from 7 to 15.8 inches. The circular breakaway safety buckle ensures that your cat or dog can quickly break away if caught on a foreign object. Made of lightweight, soft and breathable nylon, it won’t scratch your cat's skin or cause any allergies.
- 🐱【What You Will Get】You will get 1x cat collar with bell, 1x smart tracker tag, 1x waterproof holder, 1x user manual and 12 months warranty. If there are any problems about this cat tracker collar, you can contact us via amazon message, we will solve it for you immediately.
- 🐾【Warm Tips】➊ This cat tracker is mainly used to prevent pet loss. It requires Apple devices to appear around and upload the cat's location to the Apple cloud server, in order to transmit the location information to the owner's iPhone. ➋ All communication with the Find My network is anonymous and encrypted for privacy. 🐾 This pet tracker is only suitable for ios user, not for android user.
Share
